York Developments has initiated a strategic partnership to establish a 82,784 square-foot Modular Manufacturing facility on Tract 3 at North Loop in Bozeman. The new-state-of-the-art facility will be home to our strategic operating partner, a vertically-integrated Swiss company that designs, engineers, fabricates and constructs mass timber elements with a specialization in modular mass timber. The upcoming fully-automated facility in Bozeman is set to be a hybrid structure combining mass timber with steel elements, showcasing the aesthetic appeal and structural possibilities of mass timber in industrial construction.

The goal of the alliance is to create a sustainable vertical supply chain – from forestry to affordable housing.


Projects will be designed fabricated and transported at up to 95% completion to job sites.


The new facility will reduce construction costs and project completion times.


master-craftsmanship and rigorous training will create a workforce focused on innovation.


Casey Tippens

Director Of Development

406.624.7815

Montana Office

5157 US Highway 89 South

Livingston, MT 59047

850.419.5970

Mississippi Office

112 Sheffield Loop, Suite D

Hattiesburg, MS 39402

601.264.0403